The project aims to open up additional transportation routes by waterway, gradually reducing reliance on road transport and promoting the development of the logistics network in the eastern part of the capital.
With the volume of import and export goods passing through the Hai Phong area continuing to increase, the challenge is not only to expand port capacity, but also to effectively organize the flow of goods from the import and export gateway deep into the interior.
Currently, road transport still handles the majority of goods movement, putting pressure on the system of expressways, national highways, and urban gateway routes. Meanwhile, inland waterways have the advantage of transporting large volumes but have not been exploited to their full potential.
Developing cargo consolidation and container transshipment hubs connected to the waterway network has therefore become a direction to diversify transportation methods and improve the efficiency of the supply chain. In this trend, Giang Bien Inland Waterway Port is expected to add an important link to the northern logistics corridor.

No. 1 Huynh Tan Phat, Sai Dong B Industrial Park, Long Bien Ward, Hanoi City, Vietnam
Phone:
Email: